Hospital & Medical Facilities

  • Design of HVAC system and new Boiler Plant including buried and above ground totalities at Deer's Head Hospital Center, Salisbury, MD
  • Replace Medical Gas System,West Wing, Western Maryland Hospital Center, Hagerstown Maryland
  • Design chiller plant at Hitchman Building & Renovate showers at McKeldin Building at Springfield Hospital Center, Sykesville, MD
  • Replace Four Pipe Fan Coil Units, Evaporator Units & Condensing Units at Western MD Hospital, Hagerstown, MD
  • HVAC design for New 2nd Floor Lab Suite for Dr. Soares at Biology Psychology Bldg.University of Maryland College Park, MD
  • Back Up Air Conditioning for Dental School Building - IT Data Center University of Maryland, Medical Campus, Baltimore
  • Design of large Booster Pump System for 15- Story Medical Research Building, University of Maryland, Medical Campus, Baltimore
  • Design of utility services, including chilled water, steam, normal and emergency power, and communication/data network fiber duct bank,for the following buildings in the northwest area of the UMB campus, University of Maryland, Medical Campus, Baltimore, MD

Higher Education/University Experiences

  • University of Maryland at College Park
    • Design new 100% AHU, Fume Hood, and Exhaust Systems for Dr. Soares Lab, Biology Psychology Bldg., College Park, MD
    • Complete HVAC Upgrade to Institute for Research in Electronics and Applied Physics Lab(IREAP), College Park, MD
    • HVAC Upgrade to Harford Hall Student Dormitory, College Park, MD
    • Sprinkler Upgrade to Nice Hall at Chesapeake Biological Laboratory, Solomon, MD
    • Extend Heating system piping from Building III to building II and Construct New Breezeway, Universities @Shady Grove, Rockville, MD
  • University Of Maryland @ Baltimore (Medical Campus)
    • Domestic Water Booster Pump Upgrade to Bressler Research Building, Baltimore, MD
    • Convert Library to a Pharmacy Lab, Shady Grove, Rockville, MD
    • Electrical Assessment Study at 1304 St. Paul Street, Baltimore, MD
  • University Of Maryland, Baltimore County
    • HVAC Upgrades at Lecture Hall I and Classrooms in Biology-Psychology Building
  • American University
    • Convert 4th floor offices to Computer Data Center, Office of Technology, 4200 Wisconsin Avenue)
    • Major Alterations to Gymnasium Sports /Fitness Center

Government

  • Replace Chiller Plant and add new DDC at Hitchman Building, Spring Grove Hospital, Sykesville, MD
  • Replace Hot water Boiler plat, District Court, Ellicott City, MD.
  • Replace Chilled Water Plant at Eastern Correctional Institute, MD
  • Replace Four Pipe Fan Coil Units, Evaporating and Condensing Units at Western Maryland Hospital Center, Hagerstown, MD
  • New Boiler Plant for Deer’s Head Hospital Center, Salisbury, MD
  • Upgrade Sprinkler and Fire alarm system at Maryland Youth Center, Baltimore, MD
  • Renovate Showers in four wards, Mckeldin Building, Springfield Hospital Center, Sykesville, MD
  • Replace Hot water Boiler Plant at Maryland Public Television, Owings Mills, MD
  • Replace flywheel and sixteen A/C units at Maryland Correctional Institution for Women, Jessup, MD
  • Replace Chilled Water Plant at Maryland School for the Deaf, Steiner Building, Columbia, Maryland and Ely Building, Frederick, Maryland.
  • Replace Steam and Heating Hot Water Equipment & Piping, Brockbridge Correctional Facility, Jessup, MD.
  • Replace Heating and Domestic hot water boilers, Southern Maryland Pre-Release Unit, Charlotte Hall, MD
  • Replace 5,000 LF of underground chilled water piping at Thomas B. Finan Center, Cumberland, MD
  • Replace Steam Boiler and condensing pumps at Pikesville Armory, Reisterstown, Maryland
  • Replace two (2) 20,000 gallons underground oil storage tank systems, Central Services Building, Annapolis, MD
  • Replace fire alarm systems, Bard, Library and Nursing Buildings, Baltimor
  • e City Community College, Baltimore
  • HVAC upgrades Building 3, Matapeake Marine Terminal, Stevensville, MD.
  • Replace heating and domestic hot water boilers, Eastern Shore Pre-Release Unit, Chestertown, MD
  • Security System Upgrades, DGS Office Complex, 301 N. Preston Street, Baltimore
  • Replace fire alarm system at Eastern Shore Community Center, Chestertown, MD
  • Replace Heating and Domestic hot water boilers, Eastern MD Pre-Release Unit, Church Hill, MD
  • Mechanical/Electrical repairs (Steam, Water, & Electrical power systems), Garrett Building Spring Grove Hospital, Catonsville, MD
  • Replace HVAC system, 4th floor Lab Area, Psychiatric Center, Spring Grove Hospital, Catonsville, MD
  • Replace Steam to domestic HW generators, Psychiatric Center, Spring Grove Hospital, Catonsville, MD
  • Drainage of Electrical Manholes & Telephone Manholes, Western Correctional Institution, Cumberland, MD
  • Isolate HVAC system, 2nd floor clinical lab, Smith Building, Spring Grove Hospital, Catonsville, MD
  • Replace Emergency Generator, transfer switch and panels, Elkton District Court, Elkton, MD
  • Replace switch gear and MCC at Central Kitchen, Crownsville Hospital, Crownsville, MD
  • Replace fire alarm system at Queen Anne’s Armory, Chestertown, MD
  • Facility Program II TMA Bldg. & Gary Hall at Charles Hickey Jr. School, Baltimore, MD
  • Facility Program & Utility Studies, New Classroom Building & Relocatable trailers, Charles Hickey Jr. School, Baltimore, MD
  • Mechanical/Electrical Upgrades @Glendale Maintenance Facility, Glendale, MD)
  • Replace underground water tank & pumping system, Central Communications Building (911 Facility), N. Forestville, MD
  • Integrated Security System, D’Arcy Road DPWT Bldg. Complex, North Forestville, MD (In several acres of Campus like setting)
  • Replace 2000 Amp Switchboard & MCC, Central Services Building, Hyattsville, MD
  • Replace fan coil units, Marburger Building, DPWT, Forestville, MD)
  • Laurel Health Center HVAC Renovations, Laurel, MD
  • Mailroom Renovations, Warehouse Bldg. Electrical Upgrades, Central Avenue, MD

Library Experience

  • Major HVAC Renovations, Brooklyn Park Library, Baltimore,Anne Arundel County Government

K-12 School Experiences

School Board Admin Building, Cecil County Public Schools, Elkton, MD.

  • Major Mechanical/Electrical Upgrades to Cecil County Administration Building, Elkton, MD (Design of boiler plant, VAV RTU units, pumps, ductwork, DDC systems, sprinklers, and electrical/gas/water service upgrades, Const. Cost $3800K)

Baltimore City Public Schools, Baltimore, MD.

  • Major Mechanical/Electrical Upgrades to William Paca Elementary School, Baltimore, MD (Design of boiler and chiller plants, central AHU systems, Const. Cost $2500K)
  • Major Mechanical/Electrical Upgrades & Window Replacement to Francis M. Woods Elementary School, Baltimore, MD (Design of new boilers, pumps, DDC system, Const. Cost $1500K)
  • Major HVAC Upgrades to Dr. Rayner Browne Elementary School, Baltimore, MD (Const. Cost $850K)

Maryland School for the Deaf, Department of General Services, Baltimore, MD.

  • Replace chilled water plant/Boiler plant, DDC systems, electrical upgrades, and underground utilities, MD School for the Deaf, Columbia & Frederick, MD (Const. Cost $1100 K)

Anne Arundel County Public Schools

  • Install Thermal Ice Storage System, Old Mill Sr. High School, Millersville, MD (to replace 750-ton of conventional chiller plant)
  • Major HVAC Renovations, Northeast High School, Pasadena, MD (designed 650- tons chiller plant, three central AHU, pumps, piping, & DDC)
  • Replace PA Systems, Ten Elementary and Secondary Schools, Various Locations Anne Arundel County
  • Electrical/Mechanical Upgrades, Pershing Hill ES, Fort Meade
  • Replace steam and hot water boilers at four (4) secondary schools, various locations, Anne Arundel County, MD)
  • Replace Water Treatment Plant, Carrie Weedon Science Center, Galesville, MD)

Carroll County Public Schools, Westminster, MD.

  • Major Mechanical/Electrical Upgrades to William Winchester Elementary School, Westminster, MD (Design of VAV RTU units, pumps, ductwork and DDC systems, Const. Cost $1800K)
  • Major Mechanical/Electrical Upgrades to Freedom District Elementary School, Sykesville, MD (Design of VAV RTU units, pumps, ductwork and DDC systems, Electrical Service Upgrades, Const. Cost $1200K)
  • Major Mechanical/Electrical Upgrades to Charles Carroll Elementary School, Westminster, MD (Design of VAV- RTU units, pumps, ductwork and DDC systems, Const. Cost $1000K)

Prince Georges County Public Schools, Upper Marlboro, MD

  • MEP Design of 46 schools, various locations in County under three separate contracts with Johnson Controls Inc. who served as Design and Construction Manager at Risk (Const. Cost 60 million dollars, 2006-2009). Services provided included design of chiller plants, boiler plants, split systems, fan coils, unit ventilators, MZ RTU, VAV systems, UST, domestic hot water systems etc. (Example: Major MEP renovations Benjamin Tasker MS, Cost $2500K)
  • New Gymnasium, Toilets & Lobby Addition, site work, & HVAC renovations in existing school, North Forestville Elementary School, North Forestville, MD. Design of new RTU, duct distribution, gas service, plumbing and controls throughout the new addition (Const. Cost. $2400K, 12,000 SF addition to existing school)

U.S. Department of Navy

  • Design of HVAC system and new Boiler Plant including buried and above ground totalities at Deer's Head Hospital Center, Salisbury, MD
  • • Major HVAC Alterations, Building # 44, Patuxent River, MD
  • • HVAC Renovations at Bldg. 3041, 3043, 3079, Quantico, VA

MS Engineers, Inc. | 10260 Old Columbia Road, Suite A, Columbia, MD 21046, USA | 410-997-1200 | www.softrific.com